Home / Projects
Integrating office space, hotel rooms, restaurants and commercial facilities, the main building is 120 meters high with a total of 24 floors.
The project covers a land area of nearly 40,000 m2, with a total construction area of about 280,000 m2.
Planned, designed and constructed in accordance with the ICAO 4E standard, the Zhuhai Airport is capable of accommodating 4F-level take-off and landing.
The airport is a plateau airport located on a hillside 1976m above sea level.
As the second largest water source project, Dongfengxisha Reservoir will benefit over 700,000 residents.
With a daily water production capacity of 60,000 tons, the permanent water plant in the Three Gorges Project will, when completed, mainly provide water for production and operation, firefighting and daily use of the Three Gorges Dam, power station and the dam area.
The CGGC has manufactured and installed all metal structures of the permanent ship lock in the Three Gorges Dam Project.